LATEST NEWS AND CHANGES FOR NEXT WINTER

New Lifts

A brand new high speed 6-pack chair is going in to improve access from the Courchevel 1850 area to the skiing above 1650. This will replace the old slow Roc Mugnier and Praméruel chair lifts plus the Combe drag lift.

The slow Golf chair up from Méribel Village is being replaced by a high speed 4-man detachable chair.

An extension of the Cospillot draglift (below the Pralong Chair) is being made to allow access from more chalets along this very pretty run down to 1550. 

Lift Pass News..................A new 3 hour single valley lift pass is to be launched for Winter 2009/2010. The 3 consecutive hours are activated the first time the skier goes through a turnstile. This pass will answer the demand of skiers who want to ski when they like without being restricted to the 1/2 day pass times (like getting out of bed early). The 1/2 day morning pass will be discontinued except for the 3 Vallées ski area while the 1/2 day afternoon pass (from 12h30) will be maintained. Plus the integration of Courchevel 1650 into the Minipass. For 1650 visitors there was only the free Mickey and Belvédère draglifts on the Minipass. From next season, the Minipass will include the Ariondaz télécabine and Petite Bosse draglift.
 Piste Work, Snow Cannons and Avalanche Protection

There is to be major work on Murette piste down to Le Praz going ahead, possibly there are snow cannons being installed and an easier route down to the village is being planned.

The Plantrey Snow Park is being moved to the Dunes and Canyons zone underneath the Verdons telecabine so as to create a larger entertainment area, which will be both more varied and visible.The idea of the project (to be completed over several years), is to better exploit the space between the Verdons and Renard pistes by regrouping complementary activities such as: hoops, boarder, jumps, Avalanch'Camp, and other entertainment ideas

.Redevelopment of the Sittelle piste above Motteret, to make the start of this piste more accessible so as to alleviate the flow of skiers through the Rossignol ZEN* making it more of a through route.

Improvement of the signs and directions for the Snowpark des Plattières to highlight the visibility of the entry gates. Also the 2.5 hectares of the Snowpark will be upgraded and the access to the Pipe XXL at the summit will be improved.

The snow cannons on the Aigle piste and on the Plattières Area are to be replaced by newer versions with improved energy consumption and lower noise levels.

New avalanche release systems to allow faster securing of the Combe des Plattières area and therefore faster opening of the 3 Vallées link after heavy snowfalls.

Building Work

The new proposed "public" building with apartments above situated between Hotel Montana and the Gondola Station -  The creche, commune office plus a medical room & small left luggage place are planned

 

 

Latest News

FOLLOW US ON FACEBOOK!

Follow us throughout the year, news reviews and other bogs of interest on our Facebook page - 15/06/10

LATEST 6 MONTH WEATHER OUTLOOK

The weather forecast for the Northern Alps for the next 6 months from 1st February 2010 - 10/02/10

LATE SEASON ADVANCED OFF PISTE SKI TRIP…17TH TO 24TH APRIL

We are partnering with a fully qualified mountain guide to provide a superb opportunity to experience the high mountains and back country. - 07/02/10

In the Blog

Helmets in Skiing - FAQ’S

FAQ'S for the use of a helmet when sking or snowboarding.

Search

Contact Us

02392 797235 • 07768 341214
France: 0033 (0) 675544798

bookings@skicourchevel.net